For the implementation of measures for the protection of land, it is necessary to 

carry out construction (reconstruction) of approximately 535 anti-erosion 

hydrotechnical structures, in particular, 128 run-off structures, 181 anti-erosion ponds, 

and 198 structures of terracing slopes. In addition, it is necessary to ensure the 

protection of land, in particular agricultural land, from erosion and other unfavorable 

natural processes on a total area of 1.7 thousand hectares, extending 36.7 thousand 

kilometers. Financing and conducting works on land protection is carried out extremely 

slowly at the expense of the state and at the expense of local budgets.  

In 2015, as compared to 1995, all indicators decreased: the length of ditches – 

by 135.2 km; terraces – at 5.4 km; road rails – 15.8 km; anti-erosive ponds – at 177.0 

km; the area of injection of highly degraded and contaminated with harmful substances 

of arable land decreased by 12,6 thousand. hectares (Table 3).  

Table 3 Dynamics of implementation of measures for the protection of land in 

Ukraine 

Indicators 

1

9

9

5

 

2

0

0

0

 

2

0

0

5

  

2

0

1

0

  

2

0

1

3

  

2

0

1

4

  

2

0

1

5

  

2015 

compared to 

1995 

+,- 

Creation of a 
meadow of arable 
land, ha 

12785,0 9,3 6341,5 1015,2 351,5 40,2 164,8 -12620 1,3 

Construction of 
anti-erosion 
hydrotechnical 
structures: 

shafts, shaft-
ditches, km 

 

135,2 10,9 3,6 

4,1 

0,0 

0,4 

-135,2 0,0 

shaft-terraces, km 

5,4 

2,2 

6,6 

0,0 

0,0 

0,0 

0,0 

-5,4 

0,0 

shaft-roads, km 

16,0 

24,0 1,1 

0,1 

0,0 

1,6 

0,2 

-15,8 

1,3 

anti-erosion 
ponds, ha 

177,0 

18 

7,0 

6,6 

0,5 

0,0 

-177 

0,0 

pumping stations, 
pcs. 

51,0 

4,7 

2,0 

12,0 

3,0 

0,0 

-51 

0,0 

shore protection, 
km 

1,0 

9,3 

3,9 

4,3 

1,3 

0,2 

-1 

0,0 

Source: calculated by the author according to data [16]

 

 